ANNCEM President Report

ITALY 18 September  2009

PRESIDENT’S REPORT  to  ESF                                    

Mr Angelo Cortesi

The Italian spring industry ended 2008 with a 5-10% drop with respect to 2007. 2009 will close with sales below those recorded in 2008. The significant drop in turnover which began in September 2008 continued until June 2009. In the second half of 2009 sales have not dropped further and the hope is that in December 2009 the average decrease in turnover for the year will be around 25-30% with respect to 2007, the year before the start of the crisis.

The concerns that have arisen in this last period of 2009 include:

· the contraction of orders which forces our industry to work with delivery schedules of just 1 week

· the drop in prices which are often lower than the actual costs

· the delays in payment which have become a type of speculation. For example, a large telephone company is delaying payments to suppliers even after having presented a 2008 final balance with high profits and a strong demand for 2009.

· the solvency of many customers is decreasing and it forces our industry to freeze resources that are critical for the survival of our companies.

The price of raw materials, in the first quarter of 2009 was stable but the steel mills will increase their prices by 50-100 Euros as of October. An increase in raw materials prices seems to be close.

In 2010, with the information available today, the forecasts predict that sales will not improve with respect to 2009.

The dramatic situation resulting from the lack of credit to companies by the banks continues. It generated a serious increase in payment delays. In addition, leasing companies have stopped issuing medium-long term financing for equipment and investments are frozen. 

Our events for 2009 are:

· 12 February 2009, the First Tech Spring Seminar 2009, presented by Mr M. Hayes of IST at the President Conferences Centre of Brescia.

· 25 April-2 May, trip to China by 21 ANCCEM Group representatives to visit 7 spring factories and meet with the China Spring Specialty Association representatives.

· 15 May 2009, national Assembly with a «Round Table» on the economy and the market situation.

· Second Anonymous Survey among associate members regarding methods used for the calculation of the Costs/Prices of springs and the elaboration of a Report to be presented at the ANCCEM Meeting to be held on 20 November 2009.

· The ANCCEM Technical Committee worked on the revision of the EN 13906-3 Torsion Springs Standard and on the elaboration of a Quality Guide (tolerances) for torsion springs modifying some formulas for the calculation of the tolerances of torsion springs foreseen by DIN 2194/2002

· 28 September 2009, Second Tech Spring Seminar to be presented by Mr M. Hayes of IST.

· 20 November 2009, ANCCEM Professional Meeting with a lesson by Prof. C.S. Romanelli, President of Net Working srl, on «How to improve the personal resistance to stress».

The ANCCEM Board decided to help its associates by absorbing the costs of the information-training (training handbooks and technical documents) services which will be supplied free of charge during 2009 and 2010.

 

 

Convenio NH Hoteles

Convenio con NH Hoteles

NH Hoteles ofrece a la ASOCIACION ESPAÑOLA DEL MUELLE (ASEMU) un 5% de descuento sobre la mejor tarifa flexible disponible en el hotel a la hora de hacer la reserva. Este descuento es aplicable en todos nuestros hoteles de España y Portugal, tanto sobre alojamiento como sobre el desayuno y de lunes a domingo. La mejor tarifa disponible depende de las fechas en las que se quiera hacer las reservas, por lo que para saber la tarifa que se les va a aplicar en una fecha concreta deben consultar a nuestra central de reservas o al hotel directamente.El código de cliente de ASEMU para NH Hoteles es el  31130, el cual, deberá facilitarse siempre a la hora de hacer las reservas para que se les aplique el descuento comentado anteriormente.Para efectuar las reservas pueden ponerse en contacto con la Central de Reservas de NH Hoteles que está disponible 24h todos los días del año (902115116) o bien directamente con los hoteles.

Por otro lado, en el momento de realizar reservas de diez habitaciones en adelante o salas para reuniones,  se aplica precio grupo, que deberá negociarse directamente con la comercial asignada a ASEMU:

Macarena Lamas Martínez 
DEPARTAMENTO COMERCIAL 
C/ Santa Engracia, 120 – Edificio Central 6ª planta
28003 – MADRID
SPAIN
TEL. 91 451 97 88
FAX. 91 399 55 69
m.lamas.intern@nh-hotels.com
www.nh-hotels.com

AGENDA ESF-BOARD MEETING

ESF – Agenda Board meeting

Tuesday, October 20th, 2009    Starting 14:OOh

Stratford Manor Hotel Stratford upon Avon

AGENDA

1. Welcome from ESF President Mr. Federico Visentin

2. Apologies for absence

3. Approval of the Minutes of the last Executive Board meeting held on March 30th, 2009 at Frankfurt / Germany

4. Economic situation in the spring industry

     – president letters

5. ANCCEM mission to China, 25.04.09 02.05.09 report Mr. Visentin6. SMIs Fall Meeting 2009, 27.-29.09.09 in Las Vegas. report Mr. Visentin

7. Financial situation of ESF report Mr. Dannert

     Financial situation for 2009 so far budget 2010

8. Ongoing activities report Mr. Dannert

 

     New EN 15800, 2009-03 Quality specification for cold coiled compression springs.

     New ISO 26910-1, 2009-06 Springs – Shot peening General procedures.

     New ISO 26909, 2009-07 Springs – Terminology and classification of terms.

 

     Running ISO/DIS 12122 Hot formed helical compression springs

     Future activities for EN standardization for springs?

     Future activities for ISO standardization for springs?

     Symbols for springs chaired by Japan

     European proposals = ???

 

9. ESF organization

     Election of Vice-president elect (ESF statutes § 8,2)

10. Future activities

     ESF and the WIRE fair 12.- 16.04.2010 in Düsseldorf

     proposals for afternoon meeting and evening event

     Future ESF benchmark activities

     Solicitations for new ESF members

11. Next ESE-board meeting April 14, 2010 in Düsseldorf 9:30 h

12. Miscellaneous

Normativa relativa a la eliminación de PCBs

El Ministerio de Medio Ambiente, y Medio Rural y Marino ha remitido una carta a través de la Comisión de Medio Ambiente de CEOE, en la que insta a los afectados por la legislación de PCBs, (Directiva 96/59/CE, transpuesta por el Real Decreto 1378/199, relativa a la eliminación dePCBs y aparatos que los contienen) a realizar un esfuerzo con el fin de cumplir el objetivo previsto de total eliminación antes del 1 de enero de 2011. Como con toda seguridad conozca, los PCB como contaminantes orgánicos persistentes peligrosos, que se encuentran en los dieléctricos de los transformadores condensadores y otros aparatos eléctricos y recipientes, suponen un riesgo importante para la salud de las personas y el medio ambiente, al ser muy cancerígenos y producir alteraciones endocrinas y otros tipos de toxicidad. Por ello, la Directiva 96/59/CE relativa a la eliminación de los PCB, transpuesta por el RD 1378/1999, estableció la obligación de eliminar los aparatos, con un volumen de PCB superior a 5 dm3 y los PCB contenidos en los mismos antes del 01.01.2011. A falta de un año y medio para acabar el proceso de eliminación de los PCB, el MARM informa que quedan en torno al 30% (unos 120.000 aparatos) sin eliminar. Se corre el riesgo de que se genere un “cuello de botella” cuando se acerque la finalización del plazo y que, por tanto, se incremente el coste de su gestión. Con el fin de evitar las repercusiones, tanto económicas como sociales, del incumplimiento del objetivo marcado, desde el MARM se solicita que realicemos todos los esfuerzos posibles en intensificar y acelerar la eliminación de los aparatos con PCB que se encuentren en nuestras empresas.

Ultimas novedades REACH

El Reglamento REACH, Reglamento (CE) n° 1907/2006, sobre el registro, la evaluación, la autorización y la restricción de sustancias y de preparados químicos, entró en vigor el pasado 1 de junio de 2007. Este Reglamento consta de 15 Títulos (o apartados) y 17 Anexos, los cuales se van modificando y adaptando constantemente, pues el Reglamento aún no está completamente finalizado. A continuación, les adjuntamos un pequeño resumen de las novedades y actualizaciones más importantes que se han publicado, y que pueden ser de su interés, así como el enlace web donde pueden consultarlos textos oficiales:         Publicación en el Diario Oficial de la Comunidad Europea, del 26 de Junio de 2009 (L164), el Reglamento (CE) n°552/2009 de la Comisión, de 22 de junio de 2009, por el que se modifica el Reglamento (CE) n° 1907/2006 del Parlamento Europeo y del Consejo, relativo al registro, la evaluación, la autorización y la restricción de las sustancias y preparados quimicos (REACH) en lo que respecta a su anexo XVII. Se trata del Anexo relativo a la restricción de sustancias en el Reglamento REACH. Puede consultarlo en el siguiente enlace: http://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2009:164:SOM:ES:HTML  Últimas novedades en Guías REACH, que puedes encontrar en: Guidance web site – Guías resumidas de sustancias en artículos y de información de registro: http://guidance.echa.europa.eu/guidance2_en.htm – Informe ejecutivo sobre Inclusión de sustancias en Anexo XIV (Autorización) http://guidance.echa.europa.eu/guidance3_en.htm – Borrador de la Guía del Anexo V de REACH y Borrador de Guía de descriptor de usos/escenarios http://guidance.echa.europa.eu/guidance4_en.htm         Comunicación emitida por la ECHA (y que está disponible en inglés en su página web http://echa.europa.eu/doc/press/na_09_13_no_accreditations_20090730.pdf) en relacion a la acreditación de consultoras especializadas en REACH: La Agencia Europea de Sustancias y Mezclas Químicas no acreditará ni respaldará a las empresas proveedoras de asesoramiento o apoyo para el cumplimiento del reglamento. Ninguna empresa puede alegar que ha sido acreditada por la ECHA.ECHA publica este comunicado en respuesta a los informes recibidos de terceros paises, en los que se indica que algunos despachos de abogados o consultoras de la Union Europea alegan estar acreditadas o respaldadas de alguna manera por la ECHA, especialmente en lo que se refiere al registro de sustancias o formación de SIEFs. ECHA desmiente esta afirmación, la Agencia no ha acreditado a ninguna de dichas empresas. Por supuesto puede darse el caso de que la ECHA contrate a alguna empresa consultora para, por ejemplo, que esta recopile información en su lugar. En estos casos, las empresas contarán con documentación clara que explique su cometido.

Seminario Internacional de la ESF

INVITATION TO THE 2009 ESF SEMINAR

On behalf of the European Spring Federation (ESF), IST would like to invite you to the biannual ESF Seminar, which will be held on the 21st October 2009 at the Stratford Manor Hotel at Stratford upon Avon, United Kingdom, from 9.00am until 5.30pm.

Attendance at this day event costs 40.00 Pounds Sterling per delegate, and will be followed by an optional evening meal at a charge of 40.00 Pounds Sterling per person. Should you choose to stay overnight at the Hotel a special 24 hour delegate rate of 140.00 Pounds Sterling per person has been negotiated at the Hotel, which includes all of the above.

Andrew Watkinson

Managing Director

ESF SEMINAR 21st OCTOBER 2009

PROVISIONAL AGENDA

TechSpring Presentations

       

9.00 am

Opening Remarks

F. Visentin (ESF President)

Mevis Spa

       

9.10 am

TechSpring Report 1 – Introduction to TechSpring

M. Hayes

IST

       

9.40 am

TechSpring Report 2 – Prestressing

P. Thoma (to be confirmed)

Innotech Scherdel

       

10.10 am

TechSpring Report 3 – Dynamic Loading

M. Bayliss

IST

       

10.40 am

Coffee

   
       

11.10 am

TechSpring Report 4 – Residual Stress

M. Bandini

Peen Services

       

11.40 am

TechSpring Report 5 – Extension Spring

M. Hayes

IST

       

12.10 pm

TechSpring Report 6 – Cameras

A. McVeigh

Lake Image Systems

       

12.40 pm

TechSpring Report 7 – Torsion Springs

M. Hayes

IST

       

1.00 pm

Lunch

   
       

Business Presentations

       

2.00 pm

Standards Activities

H. Dannert

ESF Secretary / Chairman of ISO workgroup TC 227

       

2.30 pm

REACH

Dr. J. Lloyd

Reach Ready

       

3.00 pm

Coffee

   
       

3.20 pm

Training / Apprentices

D. Vinall

National Skills Academy

       

3.50 pm

Finance

To be confirmed

 
       

4.20 pm

Panel Discussion

   
       

5.00 pm

Closing Remarks

F. Visentin (ESF President)

Mevis Spa

       

5.15 pm

Close

   

PROPOSED LADIES PROGRAM

20th  and 21st OCTOBER 2009

 

Cost in

Pounds Sterling

20th October 2009 – pm

 

a) Wildmoor Spa – Pamper Session including 2 course lunch, massage etc.

60.00

b) Avon River Cruise followed by Falstaff Experience Tudor Museum

15.00

Please indicate on the booking form below if you prefer option a) or b)

 
   

21st October 2009

 

Open Top Bus Tour to 5 Shakespeare Houses – including lunch at Mary Arden Inn)

40.00

Anne Hathaways Cottage

 

Mary Ardens House

 

Shakespeare birthplace

 

Shakespeare found exhibition

 

Halls Croft

 

Nashes House and New Place

 

PROPOSED SOCIAL PROGRAM

22nd OCTOBER 2009

22nd October 2009 – Social Day

 

Day – Warwick Castle & Dungeons – including lunch

60.00

Evening – Royal Shakespeare Theatre Co to see «Twelfth Night»

20.00 – 40.00

Cost of the evening event depends on seating location and there will be a limited number of seats available – early booking essential.

 

Please put a tick in the box(es) of the day(s) you wish to attend

I will be attending

20th – Option a)

 

21st

 

22nd – Day

 
             
 

– Option b)

     

– Evening

 

Company:

 
   

Address

 
   
   
   

Telephone:

 

Fax:

 
   

Email

 

Internet:

 
   

Main Contact:

 

Delegate(s)

 

ESF BOARD MEETING / TECHSPRING MEETING

BOOKING FORM    20th October 2009

Company:

 
   

Address

 
   
   
   

Telephone:

 

Fax:

 
   

Email

 

Internet:

 
   

Main Contact:

 

Delegate(s)

 
   
   
   
   

PLEASE PLACE A TICK IN THE BOX OF WHICH EVENT YOU WILL BE ATTENDING:

ESF Board Meeting

   

TechSpring Meeting

 

I will require:

Lunch

Yes / No

Evening Meal

Yes / No

Lunch

Yes / No

Evening Meal

Yes / No

 

Overnight Accommodation Required

Yes / No

ACCOMMODATION: I understand that I will have to book and pay for my own accommodation at the Stratford Manor Hotel, Stratford upon Avon, details of which can be found on the Location page.

Please complete and return to:

Andrew Watkinson

Institute of Spring Technology

Henry Street, Sheffield. S3 7EQ. United Kingdom.

ESF SEMINAR     BOOKING FORM    21st October 2009

Company:

 
   

Address

 
   
   
   

Telephone:

 

Fax:

 
   

Email

 

Internet:

 
   

Main Contact:

 

Delegate(s)

 
   
   
   
   

I WILL BE ATTENDING THE ESF SEMINAR ON 21ST OCTOBER 2009 AT THE STRATFORD MANOR HOTEL, STRATFORD UPON AVON, UNITED KINGDOM.

When attending I will require:

Lunch

Yes / No

Evening Meal

Yes / No

 

Overnight Accommodation Required

Yes / No

ACCOMMODATION: I understand that I will have to book and pay for my own accommodation at the Stratford Manor Hotel, Stratford upon Avon, details of which can be found on the Location page.

Please complete and return to:

Andrew Watkinson

Institute of Spring Technology

Henry Street, Sheffield. S3 7EQ. United Kingdom.

 

LOCATION OF STRATFORD MANOR HOTEL

Stratford Manor Hotel

Warwick Road
Stratford-upon-Avon
Warwickshire
CV37 0PY

Telephone:+44 (0) 01789 731173
Fax: +44 (0)1789 731131

Email: stratfordmanor@qhotels.co.uk

Internet: www.qhotels.co.uk

 

BY AIR

Birmingham airport is 24 miles away

BY ROAD

Leave the M40 at Junction 15 and follow the A46 signposted Stratford. At the first roundabout take the A439 signposted Stratford Town Centre. Stratford Manor is one mile along this road, on the left.

Alternatively, from Stratford Town Centre follow the A439 signposted Warwick and M40. Stratford Manor is 3 miles along this road on the right.

Free parking for 220 cars.

BY RAIL

The nearest train station is Stratford-upon-Avon, 3 miles away, which has a taxi rank.

HOTEL INFORMATION

For further information regarding the Hotel visit their website at www.qhotels.co.uk, click on our hotels and choose Stratford Manor, Stratford-upon-Avon.

Hotel Bookings

Room reservations should be made directly with the Stratford Manor Hotel on 0845 074 0062 or email stratfordmanor@qhotels.co.uk quoting Institute of Spring Technology Ltd.

 

For guests attending the ESF seminar and / or the ESF Board meeting and the Techspring project meeting a special 24 hour delegate rate has been agreed with the hotel of 140.00 Pounds Sterling per night. (Guests staying at the hotel but not attending the seminar will pay a lower rate).

COMIENZA EL PRIMER PROYECTO COORDINADO DE CUMPLIMIENTO DE REACH

«REACH-EN-FORCE-1». El Foro para el Intercambio de la Información se ha reunido en Helsinki la semana pasada para comenzar a poner en marcha en proyecto y establecer los pasos a dar.

Inspectores nacionales están comprobando prerregistros, registros, y, cuando aplica, la entrega de Fichas de Datos de Seguridad. El proyecto de aplicación del Foro hace cumplir el principio fundamental del REACH: sin información, no hay comercialización (no date, no market), Los inspectores de los países participantes se centraran en las sustancias en fase transitoria (sustancias existentes) y comprobarán mediante inspecciones si las empresas han presentado un prerregistro o registro y si han entregado las fichas de datos de seguridad, en los casos necesarios.

Las visitas de inspección a las empresas se realizarán previa comunicación por escrito, y se llevarán a cabo desde la fecha actual hasta el 30 de octubre de 2009.

Este proyecto dará una primera impresión del nivel de cumplimiento con REACH de fabricantes e importadores (incluyendo representantes exclusivos) en la Unión Europea y el Area Económica Europea. Al mismo tiempo aumentará la capacidad de las autoridades para asegurar el cumplimiento de REACH.

Se designará un coordinador nacional que supervisará la implementación del proyecto en cada país participante y proporcionará entrenamiento para los inspectores locales. Con este propósito se entrenó a los coordinadores nacionales en Grupo de Trabajo del foro en las instalaciones de la ECHA a principios de abril.

Los resultados de este proyecto se completarán a finales del 2009 y el Grupo de Trabajo del foro será el encargado de analizarlos y elaborar un informe a principios del 2010. El Foro esta preparando un segundo proyecto coordinado para el año 2010.

CONVOCATORIA ABIERTA BECARIOS COMERCIO EXTERIOR EN EMPRESAS AÑO 2009-2010 DEL ICEX

CONVOCATORIA ABIERTA BECARIOS COMERCIO EXTERIOR EN EMPRESAS AÑO 2009-2010 DEL ICEX

PROGRAMA DE BECAS EN EMPRESAS 2009-2010

Objetivo

Apoyar a las empresas en su proceso de internacionalización, mediante la puesta a disposición de jóvenes profesionales formados y especializados previamente en la Red Exterior de la Secretaría de Estado de Comercio, para que culminen su proceso de formación en el entorno empresarial, buscando su integración en el ámbito laboral.

A quién va dirigido

Empresas constituidas jurídicamente en España con actividad internacional o en proceso de internacionalización, que presenten un plan estructurado de formación del becario y de actividades a desarrollar durante el periodo de beca.

Financiación

DOTACIÓN DEL BECARIO. El ICEX cubre el 100% de la dotación del becario durante los 6 primeros meses de la beca y el coste del Seguro de accidentes y asistencia en viajes.
La EMPRESA se hace cargo de la dotación durante los 6 meses restantes hasta completar el periodo de duración de la beca y de los desplazamientos del becario.
La dotación de la beca viene fiada por ICEX. no siendo un concepto

negociable. Su importe oscila entre 24.000 Euros brutos anuales, si el destino es en España, y hasta 53.000 Euros brutos anuales, en función de los destinos en el exterior. Esta dotación está sujeta a la correspondiente retención por el Impuesto sobre la Renta de las Personas Físicas.

Presentación solicitudes

Es necesario el registro previo como empresa en el Portal del ICEX:
http://www.icex.es/becas y rellenar el formulario de inscripción habilitado a tal efecto.

Fecha de solicitud

Desde el 22 de junio hasta el 31 de julio de 2009 a las 14:00 horas.

Resolución solicitudes

El fallo del Tribunal se comunicará a partir del 29 de septiembre de 2009.

Fecha de comienzo

Por regla general la incorporación del becario a la empresa se producirá en el mes de noviembre de 2009, excepto para los becarios destinados durante su 1ª fase de beca en as Oficinas Económicas y Comerciales de España en China, Japón, Rusia, Ucrania, Turquía, Kazajstán, Libia, Corea del Sur y Taiwán, cuya incorporación a empresas se producirá en enero de 2010.

Duración de la beca

12 meses

BONIFICACIONES O REDUCCIONES EN LAS CUOTAS O COTIZACIONES EMPRESARIALES A LA SEGURIDAD SOCIAL

Con el fin del reducir al máximo posible el coste social, se informa que desde Gestión de Personal le ofrecemos la posibilidad de llevar a cabo una auditoria dirigida exclusivamente al estudio, análisis y posible reclamación, en su caso, ante la Tesorería General de la Seguridad, de las bonificaciones o reducciones en las cuotas o cotizaciones empresariales que pudiendo corresponderle no se están aplicando.

Ante la crisis que estamos sufriendo, las empresas necesitan reducir costes, y el coste más caro de una empresa es el coste social.

Por este motivo, ponemos a su disposición este nuevo servicio consistente en el estudio, análisis y comprobación de las bonificaciones o reducciones en las cuotas o cotizaciones empresariales a la Seguridad Social, con el fin de que las empresas del metal, en todo momento, estén al día de las posibles bonificaciones o reducciones que legalmente se establezcan.

Con este servicio, queremos conseguir que su Empresa reduzca al máximo posible el coste social. Por ello, desde Gestión de Personal le ofrecemos la posibilidad de llevar a cabo el estudio, análisis y posible reclamación, en su caso, ante la Tesorería General de la Seguridad de dichas cuotas o reducciones que le pueden ser aplicables y que sin embargo actualmente no realiza. Si estuviera interesado no deje de consultarnos las condiciones y forma de aplicación de esta actuación.

Alcance de las sanciones tributarias por documentación de operaciones vinculadas en el ejercicio 2008

Alcance de las sanciones tributarias por documentación de operaciones vinculadas en el ejercicio 2008

En estos momentos muchas empresas están ultimando la elaboración la memoria anual correspondiente al ejercicio 2008 con la primera aplicación del nuevo Plan General de Contabilidad y su contenido puede tener trascendencia tributaria, en particular en lo referido a las operaciones vinculadas.

La Ley de Lucha contra el Fraude modificó el artículo 16 del Texto Refundido de la Ley del Impuesto de Sociedades para exigir la documentación que reglamentariamente se estableciese, con el fin de justificar que las operaciones realizadas entre personas y entidades vinculadas se han realizado a valor de mercado. Lo cierto es que el reglamento que desarrolla este precepto no se publicó hasta noviembre de 2008, y que su entrada en vigor en lo que se refiere a la documentación obligatoria se pospuso hasta febrero de 2009. A consecuencia de ello, el estricto régimen sancionador establecido en la Ley del Impuesto de sociedades no es aplicable hasta 2009, si bien ello no significa que el ejercicio 2008 esté exento de contingencias por sanciones tributarias derivadas de la carencia o deficiencias en otros documentos obligatorios relacionados con las Operaciones Vinculadas.

Se trata de un periodo de tiempo en el que está vigente la obligación documental, pero no se ha concretado la documentación fiscal obligatoria, por lo que tampoco es aplicable el régimen sancionador de la Ley del Impuesto de Sociedades.

Sin embargo, durante este periodo, sí estaba plenamente vigente la aplicación de los preceptos del nuevo Plan General de Contabilidad, tanto en su versión normal como en su especificidad para PYMES, y en particular la obligación de facilitar en la memoria la información suficiente para comprender las operaciones con partes vinculadas que se hayan efectuado y los efectos que éstas tienen sobre los estados financieros de la empresa, constituyendo una información similar a la contenida en la documentación fiscal obligatoria. Si la empresa 0pta por no incluir en su memoria la información contable obligatoria, en el supuesto de ser sometida a una inspección tributaria, podría ser sancionada por aplicación del artículo 200.1 .c) de la Ley General Tributaria, por omitir datos contables obligatorios, siendo la sanción de 150 euros por cada dato omitido con un máximo de 6.000 euros.

Por otro lado, facilitar esta información puede suponer simplificar sobremanera el acceso de la Agencia Tributaria, cuestión que tiene particular importancia si las operaciones vinculadas no se han realizado por su valor normal de mercado.

Ante esta situación, y dependiendo de la realidad de cada empresa, es interesante valorar la conveniencia de facilitar la información completa referida a las operaciones vinculadas, contrastarla con las posibles contingencias derivadas de un ajuste por el valor de mercado y en su caso decidir si se incluye la información completa en la memoria.